Project Ruth

Project RuthProject RuthProject Ruth

Project Ruth

Project RuthProject RuthProject Ruth
  • Home
  • About Us
  • Projects
  • Our Team
  • Contact Us
  • Donate
  • More
    • Home
    • About Us
    • Projects
    • Our Team
    • Contact Us
    • Donate
  • Home
  • About Us
  • Projects
  • Our Team
  • Contact Us
  • Donate

Projects - Under Construction

Donate to specific projects

This page will be used to highlight specific projects and provide a way to donate to a fund for each specific project. Below is a list of upcoming, donation specific projects. Click on the link or image for each project.

These projects are also suggestions for construction mission trips. Contact us to schedule your visit.


Thank you for your support!

Electricity

Completion of wiring the upstairs dormitory for lights, outlets, and ceiling fans. Provide electric service to the converted house. Install ceiling and wall fans in the church/community center. 


We are scheduling a construction trip for 4 - 6 workers to wire the building.

Dates are flexible.


Estimated cost for materials is $3,500.

This is a suggested 4-6 day trip, not including travel days.

Upstairs dormitory/kitchen

Satellite Internet

Provide a reliable internet connection at the facilities for remote learning and security.


Estimated cost for equipment is $750 and $100 per month for service.

Satellite Internet Equipment

Painting and Maintenance

A separate fund for building maintenance and upkeep. Installation of roof gutters and water run-off collection. Paint to keep the buildings looking fresh and clean.


This project would be ideal for ongoing mission trip activities.

Medical Clinic

Fencing

Enclose the Project Ruth facilities with a cement and metal fence and provide controlled, secure access to the property.

 

There is currently no estimated cost for this project.

This project would be ideal for ongoing mission trip activities. 

Perimeter fencing

Storage Shed

Construct a storage shed for landscaping equipment and items best stored, and secured outside.


Estimated cost for materials is $1200.

This is a suggested 4-6 day trip, not including travel days.

Future shed location

Shower/Laundry Facilities

Construction of a separate, stand-alone building with four full restrooms including a shower and changing area for short-term mission teams and local residents that do not have access to a bathing facility. The building will also provide an area for short-term mission teams and local residents to wash their laundry. No more trips down the mountain to bathe and wash clothing in the river.


Estimated cost for materials is $9,500.

This is a suggested multiple, 4-6 day mission trip.

Future Bath House/Laundry facility

Outdoor Serving Area

Complete the outdoor, shaded serving area behind the church/community center. This shaded area will be used for community meals and a relaxing area to sit in the shade with a memorable view of the mountains. A place for relaxation and meditation.


Estimated cost for materials is $3,000.

This is an estimated 4-6 day mission trip, not including travel days.

Shaded serving area behind Church/Community Center

House

Convert the previous medical clinic into a house for long-term mission couple to stay full-time on the property.


There is currently no estimated cost for this project.

This project would be ideal for ongoing mission trip activities. 

Previous Medical Clinic to be converted into long-term housing

Playground

Purchase property adjacent to the current Project Ruth facilities for a playground. Construction of a covered basketball/pickle ball court, safe activity area for the children, soccer/baseball field.


 

There is currently no estimated cost for this project.

This project would be ideal for ongoing mission trip activities. 

Future Playground

Property Acquisition

We have been offered the opportunity to purchase a large parcel of property adjacent to our current facilities. This property will be used to benefit the community in several ways. Grow crops and produce for consumption and market, future building expansion, playground, and more.


Cost is $17,500.

Property to the south of current facilities

Water line repair/replacement - GOAL REACHED!

Thank you for your support! What a great Christmas present for the community we serve. A gift that will be appreciated every day.


There is an immediate need to raise funds to replace and repair the water lines that serve the community.

The water lines are broken, yet again, and the residents have to make several trips each week to the river. It is roughly a one mile walk in each direction down and up the steep, rutted road. This is done  predominately by the women while the men work in the fields from sunrise to sunset.


Estimated cost for materials is $850.

The river where the residents gather water

Copyright © 2022 Project Ruth - All Rights Reserved. +